Haven Bath Studio · Bathroom renovations

Bathrooms, built from the bare wall up.

Scroll to see one come together

An empty bathroom shell with bare plaster walls and pipe stubs The finished bathroom with travertine walls, a freestanding bath, a glass shower and a walnut vanity
Hand-over day

This is how we hand it back.

Travertine, frameless glass, a walnut vanity and heat under the floor.

01 · Day one

And this is how it started.

Bare walls, new pipes and one centre line that the window, the bath and the drain all line up to.

02 · Stone

Stone, from the floor up.

Large-format travertine, laid row by row and matched across every wall.

03 · Fixtures

A shower you just walk into.

Frameless glass, a linear drain and a rainfall head. Nothing to step over.

04 · Finish

Walnut and warm light.

A floating vanity, backlit mirrors and heated floors under the stone.

Five weeks

One team, start to finish.

Same crew from the first wall to the last grout line.

Book a site visit
A shower corner coated in grey waterproofing membrane with a linear drain
How we build

Most of a bathroom is the part you never see.

Tiles last as long as what’s behind them. So the hidden work gets the most time.

  • i
    Waterproofing, tested

    Every wet area is sealed with a membrane and flood-tested before a single tile goes down.

  • ii
    Floors that fall to the drain

    A sloped screed, so water never sits on the floor.

  • iii
    New pipes, new wiring

    Supply lines and circuits replaced, not patched.

  • iv
    Heat under the stone

    Underfloor heating on its own thermostat.

Details

The small things you touch every day.

A brushed brass faucet filling a white bath
Brushed brassSolid, not plated
A floating walnut vanity with a stone basin
Walnut vanityMade to measure
A brass rainfall shower head running
Rainfall showerThermostatic valve
Before & after

Same room. Five weeks apart.

Drag across the photo to see the room the day we started and the day we handed it back.

The bathroom before the renovation The bathroom after the renovation
BeforeAfter
Process

Four steps, one team.

01

Site visit

1 hour

We measure, check what’s behind the walls and listen to how you use the room.

02

Design & fixed quote

About a week

Drawings, materials and one price, so nothing changes once we start.

03

Build

3 to 5 weeks

Strip-out, plumbing, waterproofing, stone and fit-out, by our own crew.

04

Hand-over

1 day

A deep clean, a walk-through and a written warranty.

Start here

Book a site visit.

Tell us a little about the room. We’ll call to set a time and come measure, free.

Free site visit and fixed quoteMonday to Friday, 8am to 5pm

Which room

What you have in mind

When